2000KVA Emergency Overnight Generator Install

Due to a fault in the HV network of a N.Ireland food factory, JJ Loughran were asked to source and install a 2000kVA backup generator to get the factory up and running for the next morning.

 

  • Network fault on 11kV/415v transformer traced and confirmed by JJ Loughran at 4:00pm
  • Backup generator & fuel storage sourced and loaded by JJ Loughran transport by 8:30pm
  • Generator onsite at food factory by 12:30am
  • Factory operational and running on generator by 4:00am, just in time for factory production at 06:00am.

 

Thanks to the #energyst team in Dublin for the fast loading of hardware and to #lccgroup for the 1:30am delivery of 15,000 Litres of diesel to get us up and running. Most importantly thanks also to our engineers who worked round the clock so that 150 staff could go to work the next morning.

Project Details

Date:

11th March 2022