Electrical Engineering

2000Kva Transformer Upgrade

  •  Disconnection and removal of an existing on site 2000Kva Transformer.
  •  Supply, installation and commission of new 2000Kva ONAN Transformer.
  • Modification of LV switchboard to change incoming cables from bottom entry to top entry by adding a rear cubicle and re-configuration of main 3200Amp incoming copper work.
  •  Installation of upgraded LV Cabling using Single Core AWA’s 4 per phase arranged using trefoil die cast cleats.
  • Installation, termination and jointing of all 3 Core XLPE 12Kv rated steel wired armoured cabling.
  • Supply of all onsite crane and forklift hire for the completion of all electrical works on site.
  • Complete design of entire project to include all electrical aspects as detailed above including civil works design for new MV equipment and services, liaising with client to adhere to strict deadline for completion of works.
  • Contract Duration – All preparation works carried out over 2 week period with main changeover shutdown completed in Christmas holiday period in 20 Hours, 4 hours ahead of schedule.Can you post please. Please place images in order as named.

Project Details

Date:

January 6 2020


Category:

Electrical Engineering