Electrical Engineering

Electrical & Mechanical Installation to ATEX Standards

Mechanical ventilation of Hydrogen gas from 14 back-up power battery rooms to required ATEX Standards.

Mechanical design and installation of duct work and Inline Ex Duct Fans.

Duct fans of protection type Ex de for use in Zoned area.

Design and manufacture of control panels for each battery room for fitting in Safe area away from zone.

Electrical installation of control panels and connection of cabling in zoned area’s by JJ Loughran CompEx Engineers (EX01 to EX04) to motors, local isolators and pressure switches.

Commissioning & leaving operational.

Contract Duration – 3 Month