- Liaising with Main contractor and Plant Manufacturer.
- Stainless Steel Basket & Bracketing, Galvanised Tray and Control Nodes Install.
- Power & Control Cable Install.
- Pneumatics Install.
- Commissioning.
Contract Duration – 4 Month
Project Details
Date:November 19 2020
Category:
Electrical Engineering